Scott Candler Water Tank/Pump Repair

Reeves Young was selected as the design-build contractor on this project for Dekalb County. For the pump repair, services include replacing the high service pump station No.1 intake header, the removal of four small transfer pumps, and the addition of two large transfer pumps. For the tank refurbishment, all three steel tanks will require new vents, ladders, and manways, as well as removal and replacement of all the coatings inside and outside.

Location:

Doraville, Georgia

Client:

DeKalb County

4 Transfer Pumps Removed

2 Large Transfer Pumps Added