PM USA WaterHub

Reeves Young was selected as the Program Manager for this expedited design-build project. Designed specifically for the Phillip Morris USA facility, The WaterHub reduces consumed water by 40% and eliminates 55% of wastewater discharge. Major equipment installation included influent pumps, rotary bar screen, odor control system, EQ/tank/pumps, fine screen, weir gates, membrane system, UV System, RO system, fiberglass reclaim tank with reclaim pumps, and a greenhouse. The overall plant capacity is 710,000 GPM expandable to 1.5 MGD.

Location:

Richmond, Virginia

Client:

Philip Morris USA

40% reduction in water consumption

1.5 MGD

55% of wastewater discharge eliminated