Featured Project

Databank ATL 4 

Reeves Young performed turnkey site package work for Brasfield & Gorrie on an 18-acre site to make way for a 173,000 SF data center. The sitework scope included blasting, excavation, water, sewer, and storm drainage. The storm drainage included over 1,000 linear feet of 72″ diameter corrugated metal pipe. There is also approximately 20,000 CY of mass rock to blast.

Location:

College Park, Georgia

Client:

Brasfield & Gorrie

173,000 square feet

18 acres

20,000 cubic yards of mass rock blasted