Menu Commercial Water Resources Heavy Civil Industrial

Featured Project

Purrysburg WTP Expansion

Reeves Young was selected as the General Contractor for this multi-faceted water treatment plant upgrade and expansion project. The scope of work included installation of new pumps at the river, reservoir, transfer, and high-pressure pump stations. It also included chemical feed facility enhancements, including the incorporation of new tanks, pumps, and modern sodium hypochlorite onsite generation equipment as well as the construction of a weir flow splitting facility, a PAC contactor, and static rapid mix equipment. The team was also responsible for installation of a new flocculation and sedimentation basin, five new dual media filters, and various valves and piping. Key enhancements were also made to the instrumentation and controls, and electrical systems and controls. This undertaking aims to double the existing treatment plant’s capacity from 15 million gallons per day (MGD) to 30 MGD

Location:

Hardeeville, South Carolina

Client:

Beaufort Jasper Water Sewer Authority 

30 MDG

5 new deal media filters

Previous Project Snake Creek Water Treatment Plant Expansion
Next Project Norfolk Southern