Menu Commercial Water Resources Heavy Civil Industrial

Featured Project

Atlanta BeltLine Southside Trail Segments 4 and 5 

Reeves Young was selected as the General Contractor for the installation  of a 14-foot-wide concrete multi-use path for Atlanta BeltLine extending approximately 3.1 miles from the paved trail at Pittsburgh Yards (near the I-75 underpass) to the end of the unpaved Southside Trail at Bill Kennedy Way. Southside Trail – Segments 2 and 3 make up 1.9 miles, and Segments 4 and 5 are 1.2 miles. Additional site elements include planting, lighting, retaining walls, vertical connections to adjoining streets, storm drainage, signage/wayfinding, and the replacement and rehabilitation of several bridges. The design also included streetscape/accessibility improvements on all intersecting streets extending from the corridor to the nearest intersection or one-quarter mile, whichever was closest.

Location:

Atlanta, Georgia

Client:

Atlanta Beltline Inc.

1.2 Miles of Trail

14 foot-wide path

Previous Project Avondale Estates Town Green
Next Project Tanners Bridge WRF