Lithonia Pump Station No. 1

This project was a fast-track design-build for a 10 MGD pump station. It included a 30-foot excavation in solid rock; 5,000 CY of cast-in-place concrete, 30,000 CY of rock excavation, and 3,000 LF of pipe. The project required work performed in multiple shifts, 24 hours a day, seven days a week. Equipment included submersible pumps, chopper pumps, slide gates, an odor control system, and a magnesium hydraulic feed system. A temporary bypass of the existing facility also was required for the duration of the project.

Location:

Lithonia, Georgia

Client:

DeKalb County Dept. of Watershed Mgmt.

10 MGD

5,000 CY of cast in place concrete

30,000 CY of rock excavation