Menu Commercial Water Resources Heavy Civil Industrial

Featured Project

Riverbend Environmental Complex

This new, 0.5 MGD Wastewater Treatment Plant on a 20.2 acre property consisted of screening, sequencing batch reactors, clarification, filtration, UV disinfection, post aeration, sludge holding, thickening and dewatering, plant drain pump station, chemical feed systems, a building rehabilitation, and electrical power distribution including standby generator, new SCADA system and two new lift stations. The Airport No. 1 Lift Station and Force Main consisted of replacement of pumps, starters and other equipment at the existing pump station and installation of 17,000 LF of a 12″ high density polyethylene pipe. Smithwick Creek Lift Station and Force Main consists of new submersible wastewater pump station and installation of approximately 15,000 LF of a 10″ high density polyethylene pipe, 2,300 LF of 24″ ductile iron pipe sanitary sewer and 1,300 LF of 8″ PVC sanitary sewer.

Location:

Canton, Georgia

Client:

Cherokee County Water and Sewage Authority

.5 MGD

20.2 acre property

35,600 LF of pipe

Previous Project Rockbridge Road
Next Project River Park Force Main