South Cobb Pump Station

Reeves Young was chosen as the General Contractor for the rehabilitation of an existing wastewater pump station that was flooded with raw sewage, leaving it inoperable. The project involved cleaning the 200’ influent lift station, removing and replacing submerged mechanical, structural, and electrical components, and testing and recommissioning the Station. The pump station is underground, approximately 100’ in diameter, and extends approximately 204’ below grade. The lift station has a concentric cylinder configuration with the inner circle functioning as the wet well and the dry well occupying the annular space between the outer cylinder and the wet well exterior wall.

Location:

Austell, Georgia

Client:

Cobb County Water System

100' underground pump station

120 MG

1 acre

Previous Project Gibson Creek Equalization Facility