Menu Commercial Water Resources Heavy Civil Industrial

Featured Project

Tanners Bridge WRF

This progressive design-build project for Barrow County included providing design and construction services to expand the capacity of Tanner’s Bridge Wastewater Treatment Facility to 1.5 MGD. Design features included septage receiving, headworks, a splitter box, two sequencing batch reactors, an equalization basin, a dewatering building with belt press, a digester, a chlorine contact chamber, and a flow monitor effluent pump station, and aeration and discharged into the Apalachee River.

Location:

Bethlehem, Georgia

Client:

Barrow County

1.5 MGD

60% Self Perform

Previous Project Atlanta BeltLine Southside Trail Segments 4 and 5 
Next Project Eastanolle Creek WPCP